This is the latest drone picture of the Mynydd Mawr Home taken yesterday.

  • Building 1 is to be used for the therapy pool along with offices, training room, gymnasium and the bar area for functions.
  • Building 2 has 8 beds along with building 4 and 5.
  • Building 3 has 16 beds and building 6 has 9.

These buildings will all be independent with each other and will have interconnecting paths and steps in the internal gardens.

Every building has a secure garden plus access available to use the large pergola that will be built in the centre of the garden area.

There will be a one way road system around the inside perimeter with drop off points at the main entrance of each building. The car park will be at the bottom of the site for all staff, visitors and mini buses